Crónicas de cableado

Ancho de banda y velocidades de datos

Los términos ancho de banda y velocidad de los datos suelen usarse indistintamente, pero de hecho son muy diferentes si trabaja en el mundo del cableado.

17 de octubre de 2019

Trazado del cableado: ¿hasta 600 V?

In a typical week, we get more questions on our Pro3000 Tone and Probe Series than any other product.  That’s not surprising, as we sell a very large quantity of these testers.

10 de octubre de 2019

¿Tres nuevos productos innovadores y quizás uno futuro?

If you dropped by the Fluke Networks booth at the Fall BICSI Exhibition on Las Vegas this week, you had a chance to see three winners of the Cabling Installation and Maintenance Magazine’s Innovator’s Awards, and a possible candidate for a future award.

4 de octubre de 2019

Diferentes clavijas, misma comprobación

Varios proveedores ofrecen clavijas terminadas en el campo, tanto en forma de crimpado como de desplazamiento de aislamiento modular. Estas clavijas se pueden terminar en un cable de par trenzado de categoría para crear latiguillos o para usar en un enlace terminado de conexión modular (MPTL) donde el cable horizontal se termina en un extremo hasta una terminación en campo de RJ-45 y se conecta directamente a un dispositivo, lo que elimina la salida y el latiguillo en el dispositivo final.

17 de septiembre de 2019

Resultados de los cables de referencia de comprobación (TRC): Por qué a usted, el propietario, debería importarle

Además de los resultados de pérdida y longitud de inserción de enlaces individuales, un informe de LinkWare Live incluye mucha otra información útil, incluida la fecha y hora de la comprobación, el límite de comprobación seleccionado en función de la aplicación y el tipo de cable.  Y hay otra información que, como propietario y operador, no debe pasar por alto: los resultados de la verificación de los cables de referencia de comprobación (TRC). Aunque puede centrarse en los resultados de enlace individuales de su informe de comprobación, todos sus enlaces podrían ser sospechosos si los TRC fallan.

11 de septiembre de 2019

Iluminando el camino para comunicaciones de luz visible

Lately it seems that there is a lot of attention surrounding digital lighting and the ability to power and control LED lights over the network infrastructure using Ethernet-based technologies like TCP/IP and PoE. While the benefits of LED lighting are becoming well known – energy efficiency, reduced installation and maintenance costs, and integration with IoT – there’s yet another benefit looming on the horizon.

4 de septiembre de 2019

Serie 101: configure el asistente de referencia.

When it comes to testing fiber systems, connector loss refers to the loss of a mated pair of connectors – it’s actually impossible to measure a single connector.  To test the loss of the first connector, it must be mated to a similar, known quality connector. That’s where Test Reference Cords (TRCs) come in.

27 de agosto de 2019

Serie 101: Trenzado frente a Latiguillos sólidos

You’ve likely heard copper patch cords referred to as being constructed of either “stranded” or “solid” cable, but do you know the difference and which to choose when? 

Just like the name implies, stranded four-pair cables are cables where each of the eight conductors of the four-pair cable are constructed of multiple “strands” of wires wrapped around each other, while solid cables are constructed with just one solid copper wire per conductor.

21 de agosto de 2019

7 razones para certificar

Cuando se trata de comprobar una instalación de cableado, básicamente existen tres opciones: verificación, cualificación y certificación. La verificación es excelente para la resolución de problemas, ya que le dirá si su cableado está conectado correctamente y puede ayudarle a encontrar roturas, conectores y empalmes. La cualificación le permite saber si el cable que se somete a comprobación admitirá una aplicación específica, lo que hace que sea ideal para pequeños movimientos, incorporaciones y cambios, o para determinar si una instalación del cableado existente puede admitir una aplicación (piense en una comprobación 2.5/5GBASE-T sobre una base instalada de Cat 6).

13 de agosto de 2019